* indicates a required field

First Name:

*

Last Name:

*

Company Name:

*

Job Title:

Street Address:

*

Suite:

City:

*

State:

*

Zip Code:

*

Daytime Phone Number:

*

Cell Phone Number:

Fax:

Email Address:

*


PLEASE CHECK YOUR AREA(S) OF INTEREST:
Discuss your Project with a MixOnSite Representative
Cellular Concrete Projects
Receive Geofill Lightweight Cellular Concrete Sample
Receive Sample Specifications
Receive Cellular Concrete Brochure
Geotechnical Projects
Receive MixOnSite Services Binder
Receive AB Chance Technical Manual
Receive AB Chance Helicap Design Software

General inquiry or other topic (please describe below)

MixOnSite MAILINGS & TECHNICAL BULLETINS:
Do you want to receive E-mail news from MixOnSite?
Would you like to receive USPS mail from MixOnSite?


 

 

 

 

  Distribution Center
Reno, Nevada
  Slab Curl Problems Solved

This new distribution warehouse was plagued by severe deterioration and ride-ability problems caused by slab curl shortly after construction. This loss of sub grade support at construction and control joints caused differential slab movement as forklifts passed over the area.

Sub grade support was restored by pumping a cement and fly ash grout in under low pressure to fill the voids and stabilize the slab. Surface repairs included grinding the surface to improve ride-ability, partial depth removal/replacement of the distressed concrete, and installation of new joint sealant.

 

Copyright © 2008, MixOnSite, LLC. All Rights Reserved.