 |
|
 |
|
|
 |
| |
I-88 over Rt 53 Naperville, IL |
| |
Helical Tiebacks |
|
This project site was adjacent to an existing bridge abutment located along the west bound lanes of I-88. A solider pile and lagging wall with one row of helical tiebacks was designed to retain an excavation with a maximum depth of approximately 27’. Eight tieback anchors were installed at a 20 degree incline from horizontal using an installation torque of 8,000 ft.-lbs.
|
|
|
 |
|
|